so as you read in my previous post about the
check valve, we finally figured out the problem with my plumbing! however, in order to do this we had to pull up my hardwood floors. and because they were installed tongue & groove, we had to remove entire strips of them (and hope not to break too many since we were having absolutely no luck finding matching hardwood -- originally i bought them from
building materials outlet). such a hassle.
dad came up with the brilliant idea of labeling each plank as we took it out, so that it would be easier to put them all back in again.
we had to literally remove half of my floor. see all those rows with boards removed? yep, we had to take out those entire rows.
and then of course we had to put it all back in. we repainted with more
killz odor hiding paint, wait for it to dry, then re-measure, re-snap the chalk lines, lay the mat, re-snap the chalk lines on the mat, lay the hardwood and secure it in. it took a few days.
thank goodness we labeled all the planks, made it go much much faster. my dad is a genius :)
No comments:
Post a Comment